Project Details
This page displays current information for project DEA: 080N56U4.
Project Information
Project Identifiers | Project ID: 209950 DEA: 080N56U4 EFIS: 0813000176 |
---|---|
DIST-CO-RTE-PM | 08-SBD-40-R94.7/R99.7 |
Award Date | 01/22/2015 |
Closeout Date | 09/17/2018 |
Work Description | BRIDGE REPLACEMENTS. |
Location Description | SAN BERNARDINO COUNTY NEAR ESSEX AT HALLER WASH BRIDGE AT ROJO WASH BRIDGE AND AT CLIPPER VALLEY WASH BRIDGE |
QA Service Level | 1 (Verified on 04/29/2015) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
darcy.davis@dot.ca.gov | Darcy Davis | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 80 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2015-06-09-6 | 06/09/2015 | 06/10/2015 | Preliminary | Concrete | View |
2015-06-09-7 | 06/09/2015 | 06/10/2015 | Preliminary | Concrete | View |
2015-11-09-4 | 11/09/2015 | 11/13/2015 | Quality Assurance | Concrete | View |
2015-12-22-13 | 12/22/2015 | 12/24/2015 | Quality Assurance | Concrete | View |
2015-12-22-14 | 12/22/2015 | 12/24/2015 | Quality Assurance | Concrete | View |
2016-02-11-7 | 02/11/2016 | 02/12/2016 | Quality Assurance | Concrete | View |
2016-03-30-2 | 03/30/2016 | 04/04/2016 | Quality Assurance | Concrete | View |
2016-03-28-1 | 03/28/2016 | 04/04/2016 | Quality Assurance | Concrete | View |
2016-08-29-17 | 08/29/2016 | 09/01/2016 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2016-08-29-18 | 08/29/2016 | 09/01/2016 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods