Project Details
This page displays current information for project DEA: 043J0104.
Project Information
Project Identifiers | Project ID: 209896 DEA: 043J0104 EFIS: 0415000070 |
---|---|
DIST-CO-RTE-PM | 04-NAP-29,029-6.9,5.3, var |
Award Date | 09/10/2014 |
Closeout Date | 01/14/2016 |
Work Description | Repair Damage to Bridge |
Location Description | At Napa River Bridge OH and at Imola Avenue |
QA Service Level | 1 (Verified on 03/11/2015) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Chris.Moulton@dot.ca.gov | Chris Moulton | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-8 of 8 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2015-02-05-4 | 02/05/2015 | 02/10/2015 | Quality Control | Concrete | View |
2015-02-05-3 | 02/05/2015 | 02/10/2015 | Quality Control | Concrete | View |
2015-02-05-2 | 02/05/2015 | 02/10/2015 | Quality Control | Concrete | View |
2015-01-13-2 | 01/13/2015 | 02/06/2015 | Quality Control | Concrete | View |
2014-12-18-2 | 12/18/2014 | 12/24/2014 | Quality Control | Concrete | View |
2014-12-18-1 | 12/18/2014 | 12/24/2014 | Quality Control | Concrete | View |
2014-12-04-2 | 12/04/2014 | 12/09/2014 | Quality Control | Concrete | View |
2014-12-04-1 | 12/04/2014 | 12/09/2014 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods