Project Details

This page displays current information for project DEA: 04297634.

Project Information

Project IdentifiersProject ID: 209820
DEA: 04297634
EFIS: 0415000040
COOP: 042548
DIST-CO-RTE-PM04-ALA-84,680-17.9/21
Award Date02/19/2021
Closeout DateNot set
Work DescriptionROUTE 84 WIDENING (4-LANE EXPRESSWAY) FROM I-680 TO PIGEON PASS, INCLUDING INTERSECTION, DRAINAGE IMPROVEMENTS AND UTILITY RELOCATION.
Location DescriptionALAMEDA COUNTY IN AND NEAR SUNOL, PLEASANTON, AND LIVERMORE ON ROUTE 84 FROM 0.1 MILE EAST OF ROUTE 680 TO 0.1 MILE SOUTH OF RUBY HILL DRIVE AND ON ROUTE 680 FROM 1.2 MILES SOUTH TO 1.8 MILES NORTH OF ROUTE 84
QA Service Level1 (Verified on 11/04/2019)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
paramjit.pandher@dot.ca.govParamjit PandherResident EngineerCaltrans RE DB
Ehab.Wahed@dot.ca.govEhab WahedStructural RepresentativeCaltrans SR DB
dylan.larose@dot.ca.govDylan LaroseMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 371-380 of 598 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2022-08-26-4908/26/202208/26/2022Quality ControlConcreteView
2022-08-29-3708/29/202208/29/2022Quality ControlConcreteView
2022-08-30-4408/30/202208/30/2022Quality ControlConcreteView
2022-08-31-1308/31/202208/31/2022Quality ControlConcreteView
2022-08-15-5108/15/202209/05/2022Quality AssuranceConcreteView
2022-08-17-7408/17/202209/05/2022Quality AssuranceConcreteView
2022-08-18-8308/18/202209/05/2022Quality AssuranceConcreteView
2022-08-18-8408/18/202209/05/2022Quality AssuranceConcreteView
2022-08-25-6508/25/202209/05/2022Quality AssuranceConcreteView
2022-08-26-6008/26/202209/05/2022Quality AssuranceConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods