Project Details
This page displays current information for project DEA: 04235524.
Project Information
Project Identifiers | Project ID: 209708 DEA: 04235524 EFIS: 0412000496 COOP: 042536,042616 |
---|---|
DIST-CO-RTE-PM | 04-SM-92,82-R11.2/10.5 |
Award Date | 01/20/2017 |
Closeout Date | 02/14/2018 |
Work Description | IMPROVEMENTS TO THE STATE ROUTE (SR) 92/EL CAMINO REAL (SR82) INTERCHANGE |
Location Description | IN THE CITY OF SAN MATEO |
QA Service Level | 1 (Verified on 10/24/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
douglas.inori@dot.ca.gov | Doug Inori | Resident Engineer | Caltrans RE DB |
jordan.jarosz@dot.ca.gov | jordan jarosz | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 28 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2017-09-22-5 | 09/22/2017 | 10/11/2017 | Quality Assurance | Concrete | View |
2017-09-08-5 | 09/08/2017 | 09/12/2017 | Quality Assurance | Concrete | View |
2017-08-30-8 | 08/30/2017 | 09/12/2017 | Quality Assurance | Concrete | View |
2017-08-29-5 | 08/29/2017 | 09/12/2017 | Quality Assurance | Concrete | View |
2017-08-08-16 | 08/08/2017 | 09/12/2017 | Quality Assurance | Concrete | View |
2017-08-18-11 | 08/18/2017 | 09/12/2017 | Quality Assurance | Concrete | View |
2017-07-27-10 | 07/27/2017 | 08/01/2017 | Quality Assurance | Concrete | View |
2017-07-25-16 | 07/25/2017 | 08/01/2017 | Quality Assurance | Concrete | View |
2017-07-18-21 | 07/18/2017 | 08/01/2017 | Quality Assurance | Concrete | View |
2017-07-14-8 | 07/14/2017 | 08/01/2017 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods