Project Details
This page displays current information for project DEA: 08347704.
Project Information
Project Identifiers | Project ID: 209695 DEA: 08347704 EFIS: 0800000616 |
---|---|
DIST-CO-RTE-PM | 08-SBD-SR-58-0/12.9 |
Award Date | 11/10/2017 |
Closeout Date | 01/14/2021 |
Work Description | (Alternative Delivery) The CMGC project will upgrade SR 58 from 2- to 4-lanes in San Bernardino County from the Kern County line to 7.5 miles east of US-395. |
Location Description | SR-58 / 395 Kramer Junction project. In San Bernardino County from the Kern County line to 7.5 miles east of US-395. |
QA Service Level | 1 (Verified on 12/01/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
shaine.shahidi@dot.ca.gov | Shaine Shahidi | Resident Engineer | Caltrans RE DB |
osama.abdalla@dot.ca.gov | Osama Abdalla | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 394 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-06-12-12 | 06/12/2020 | 06/15/2020 | Department Acceptance | Hot Mix Asphalt | View |
2020-06-11-40 | 06/11/2020 | 06/12/2020 | Department Acceptance | Hot Mix Asphalt | View |
2020-06-05-15 | 06/05/2020 | 06/06/2020 | Verification | Concrete | View |
2020-06-04-21 | 06/04/2020 | 06/30/2020 | Quality Assurance | Concrete | View |
2020-04-02-9 | 04/02/2020 | 04/08/2020 | Verification | Aggregate | View |
2020-03-03-9 | 03/03/2020 | 03/04/2020 | Department Acceptance | Hot Mix Asphalt | View |
2020-03-03-10 | 03/03/2020 | 03/04/2020 | Department Acceptance | Hot Mix Asphalt | View |
2020-02-08-1 | 02/08/2020 | 02/10/2020 | Verification | Aggregate | View |
2020-02-07-8 | 02/07/2020 | 02/10/2020 | Verification | Aggregate | View |
2020-01-10-12 | 01/10/2020 | 01/11/2020 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods