Project Details
This page displays current information for project DEA: 08347704.
Project Information
| Project Identifiers | Project ID: 209695 DEA: 08347704 EFIS: 0800000616 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-SR-58-0/12.9 |
| Award Date | 11/10/2017 |
| Closeout Date | 01/14/2021 |
| Work Description | (Alternative Delivery) The CMGC project will upgrade SR 58 from 2- to 4-lanes in San Bernardino County from the Kern County line to 7.5 miles east of US-395. |
| Location Description | SR-58 / 395 Kramer Junction project. In San Bernardino County from the Kern County line to 7.5 miles east of US-395. |
| QA Service Level | 1 (Verified on 12/01/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| shaine.shahidi@dot.ca.gov | Shaine Shahidi | Resident Engineer | Caltrans RE DB |
| osama.abdalla@dot.ca.gov | Osama Abdalla | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 81-90 of 394 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2018-09-11-24 | 09/11/2018 | 10/09/2018 | Quality Assurance | Concrete | View |
| 2018-09-12-10 | 09/12/2018 | 10/10/2018 | Quality Assurance | Concrete | View |
| 2018-09-12-11 | 09/12/2018 | 10/10/2018 | Quality Assurance | Concrete | View |
| 2018-09-13-6 | 09/13/2018 | 10/11/2018 | Quality Assurance | Concrete | View |
| 2018-09-17-27 | 09/17/2018 | 10/15/2018 | Quality Assurance | Concrete | View |
| 2018-09-17-28 | 09/17/2018 | 10/15/2018 | Quality Assurance | Concrete | View |
| 2018-09-17-29 | 09/17/2018 | 10/15/2018 | Quality Assurance | Concrete | View |
| 2018-09-18-9 | 09/18/2018 | 10/16/2018 | Quality Assurance | Concrete | View |
| 2018-09-19-11 | 09/19/2018 | 10/16/2018 | Quality Assurance | Concrete | View |
| 2018-09-19-12 | 09/19/2018 | 10/17/2018 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
