Project Details
This page displays current information for project DEA: 08347704.
Project Information
Project Identifiers | Project ID: 209695 DEA: 08347704 EFIS: 0800000616 |
---|---|
DIST-CO-RTE-PM | 08-SBD-SR-58-0/12.9 |
Award Date | 11/10/2017 |
Closeout Date | 01/14/2021 |
Work Description | (Alternative Delivery) The CMGC project will upgrade SR 58 from 2- to 4-lanes in San Bernardino County from the Kern County line to 7.5 miles east of US-395. |
Location Description | SR-58 / 395 Kramer Junction project. In San Bernardino County from the Kern County line to 7.5 miles east of US-395. |
QA Service Level | 1 (Verified on 12/01/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
shaine.shahidi@dot.ca.gov | Shaine Shahidi | Resident Engineer | Caltrans RE DB |
osama.abdalla@dot.ca.gov | Osama Abdalla | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 71-80 of 394 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2015-08-12-11 | 08/12/2015 | 08/13/2015 | Preliminary | Soil | View |
2015-08-12-12 | 08/12/2015 | 08/13/2015 | Preliminary | Soil | View |
2015-08-12-13 | 08/12/2015 | 08/13/2015 | Preliminary | Soil | View |
2015-08-12-14 | 08/12/2015 | 08/13/2015 | Preliminary | Soil | View |
2015-08-12-15 | 08/12/2015 | 08/13/2015 | Preliminary | Soil | View |
2015-08-12-16 | 08/12/2015 | 08/13/2015 | Preliminary | Soil | View |
2015-08-12-17 | 08/12/2015 | 08/13/2015 | Preliminary | Soil | View |
2018-03-23-3 | 03/23/2018 | 03/27/2018 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2018-03-20-7 | 03/20/2018 | 03/22/2018 | Quality Assurance | Concrete | View |
2018-03-26-3 | 03/26/2018 | 03/28/2018 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods