Project Details
This page displays current information for project DEA: 080J0704.
Project Information
Project Identifiers | Project ID: 209694 DEA: 080J0704 EFIS: 0800000282 |
---|---|
DIST-CO-RTE-PM | 08-SBD-215-0.6/1.7 |
Award Date | 10/17/2017 |
Closeout Date | 04/23/2020 |
Work Description | (Alternative Delivery) The CMGC project will reconstruct and improve interchange of I-215 and Barton Road in the City of Grand Terrace, CA. |
Location Description | Grade separation at Intersection of I-215 and Barton Road near Grand Terrace, CA. ? On I-215 between I-10 and SR-60. |
QA Service Level | 1 (Verified on 12/11/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
fereydoon.alipanah@dot.ca.gov | Fereydoon Alipanah | Resident Engineer | Caltrans RE DB |
tim.flores@dot.ca.gov | Tim Flores | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 41-50 of 107 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-04-16-3 | 04/16/2018 | 06/06/2018 | Quality Assurance | SMTL TM5 - Couplers | View |
2018-04-16-4 | 04/16/2018 | 06/06/2018 | Quality Assurance | SMTL TM5 - Couplers | View |
2018-06-01-9 | 06/01/2018 | 06/11/2018 | Quality Assurance | Concrete | View |
2018-06-11-10 | 06/11/2018 | 06/18/2018 | Quality Assurance | Concrete | View |
2018-06-20-36 | 06/20/2018 | 06/27/2018 | Quality Assurance | Concrete | View |
2018-06-20-37 | 06/20/2018 | 06/27/2018 | Quality Assurance | Concrete | View |
2018-06-11-15 | 06/11/2018 | 06/18/2018 | Quality Assurance | Concrete | View |
2018-07-03-22 | 07/03/2018 | 07/19/2018 | Quality Assurance | Concrete | View |
2018-07-03-23 | 07/03/2018 | 07/19/2018 | Quality Assurance | Concrete | View |
2018-07-18-23 | 07/18/2018 | 08/07/2018 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods