Project Details
This page displays current information for project DEA: 04014104.
Project Information
Project Identifiers | Project ID: 209417 DEA: 04014104 EFIS: 0413000133 |
---|---|
DIST-CO-RTE-PM | 04-ALA-80-2.6 |
Award Date | 07/29/2014 |
Closeout Date | 08/20/2018 |
Work Description | CONSTRUCT SFOBB MAINTENANCE FACILITIES - PHASE II |
Location Description | IN ALAMEDA COUNTY ON ROUTE 80 AT THE SAN FRANCISCO BAY BRIDGE MAINTENANCE YARD |
QA Service Level | 1 (Verified on 05/05/2014) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
behzad.halali@dot.ca.gov | Behzad Halali | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 11-17 of 17 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2015-07-22-5 | 07/22/2015 | 07/27/2015 | Quality Control | Concrete | View |
2015-08-13-3 | 08/13/2015 | 08/17/2015 | Quality Control | Concrete | View |
2015-08-13-4 | 08/13/2015 | 08/17/2015 | Quality Control | Concrete | View |
2015-08-13-5 | 08/13/2015 | 08/17/2015 | Quality Control | Concrete | View |
2015-08-13-6 | 08/13/2015 | 08/17/2015 | Quality Control | Concrete | View |
2015-09-15-2 | 09/15/2015 | 09/18/2015 | Quality Control | Concrete | View |
2015-09-15-3 | 09/15/2015 | 09/18/2015 | Quality Control | Concrete | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods