Project Details
This page displays current information for project DEA: 04235624.
Project Information
Project Identifiers | Project ID: 209187 DEA: 04235624 EFIS: 0400000678 COOP: 042583 |
---|---|
DIST-CO-RTE-PM | 04-SCL,SM-101-52.0/52.6,0.0/0.6 |
Award Date | 04/28/2015 |
Closeout Date | 01/08/2020 |
Work Description | BRIDGE REPLACEMENT |
Location Description | SANTA CLARA AND SAN MATEO COUNTIES IN PALO ALTO AND EAST PALO ALTO FROM OREGON EXPRESSWAY OVERCROSSING TO 0.3 MILE SOUTH OF UNIVERSITY AVENUE OVERCROSSING |
QA Service Level | 1 (Verified on 12/11/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
fernando.abela@dot.ca.gov | Fernando Abela | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 81-90 of 109 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2016-08-15-9 | 08/15/2016 | 08/15/2016 | Quality Control | Aggregate | View |
2016-08-08-9 | 08/08/2016 | 08/15/2016 | Quality Control | Aggregate | View |
2016-08-19-4 | 08/19/2016 | 08/19/2016 | Quality Control | Aggregate | View |
2016-06-22-4 | 06/22/2016 | 06/24/2016 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2016-06-22-3 | 06/22/2016 | 06/24/2016 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2015-10-13-14 | 10/13/2015 | 10/14/2015 | Quality Control | Concrete | View |
2015-10-13-13 | 10/13/2015 | 10/14/2015 | Quality Control | Concrete | View |
2015-10-13-12 | 10/13/2015 | 10/14/2015 | Quality Control | Concrete | View |
2015-10-13-11 | 10/13/2015 | 10/14/2015 | Quality Control | Concrete | View |
2015-10-13-10 | 10/13/2015 | 10/14/2015 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods