Project Details
This page displays current information for project DEA: 030F2204.
Project Information
Project Identifiers | Project ID: 209175 DEA: 030F2204 EFIS: 0300000072 |
---|---|
DIST-CO-RTE-PM | 03-ED-50-R30.7/R31.7 |
Award Date | 02/25/2014 |
Closeout Date | 07/30/2015 |
Work Description | REPLACE BRIDGE. |
Location Description | SLY PARK UNDERCROSSING |
QA Service Level | 1 (Verified on 11/01/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jarrett.woodruff@dot.ca.gov | Jarrett Woodruff | Resident Engineer | Caltrans RE DB |
brandon.miller@dot.ca.gov | Brandon Miller | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 71-80 of 150 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2014-08-01-14457127 | 08/01/2014 | 08/01/2014 | Quality Control | Aggregate | View |
2014-08-01-14457128 | 08/01/2014 | 08/01/2014 | Quality Control | Concrete | View |
2014-08-02-1 | 08/02/2014 | 08/02/2014 | Quality Control | Aggregate | View |
2014-08-02-2 | 08/02/2014 | 08/02/2014 | Quality Control | Concrete | View |
2014-07-26-6106077 | 07/26/2014 | 08/04/2014 | Verification | Concrete | View |
2014-07-30-5304332 | 07/30/2014 | 08/04/2014 | Verification | Concrete | View |
2014-08-01-14457124 | 08/01/2014 | 08/04/2014 | Verification | Concrete | View |
2014-08-02-3 | 08/02/2014 | 08/04/2014 | Verification | Concrete | View |
2014-08-30-3 | 08/30/2014 | 08/30/2014 | Quality Control | Concrete | View |
2014-08-30-4 | 08/30/2014 | 08/30/2014 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods