Project Details
This page displays current information for project DEA: 043A8704.
Project Information
Project Identifiers | Project ID: 209153 DEA: 043A8704 EFIS: 0400000967 |
---|---|
DIST-CO-RTE-PM | 04-CC-680-22.7/24.8 |
Award Date | 04/16/2014 |
Closeout Date | 09/28/2016 |
Work Description | RETROFIT BRIDGE, REPLACE BRIDGE, AND CONSTRUCT EMERGENCY ACCESS LANE. |
Location Description | CONTRA COSTA COUNTY IN AND NEAR MARTINEZ FROM ARTHUR ROAD UNDERCROSSING TO 0.5 MILE NORTH OF MOCOCO OVERHEAD |
QA Service Level | 1 (Verified on 02/06/2014) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
marvin.guinez@dot.ca.gov | Marvin Guinez | Resident Engineer | Caltrans RE DB |
alejandro.Lara@dot.ca.gov | Alejandro Lara | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 48 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2015-07-31-4 | 07/31/2015 | 08/10/2015 | Quality Control | Concrete | View |
2015-07-31-5 | 07/31/2015 | 08/10/2015 | Quality Control | Concrete | View |
2015-07-31-6 | 07/31/2015 | 08/10/2015 | Quality Control | Concrete | View |
2015-07-31-7 | 07/31/2015 | 08/10/2015 | Quality Control | Concrete | View |
2015-07-31-9 | 07/31/2015 | 08/10/2015 | Verification | Concrete | View |
2015-08-13-9 | 08/13/2015 | 08/21/2015 | Quality Control | Concrete | View |
2015-08-17-3 | 08/17/2015 | 08/21/2015 | Quality Control | Concrete | View |
2015-08-17-4 | 08/17/2015 | 08/21/2015 | Quality Control | Concrete | View |
2015-08-17-5 | 08/17/2015 | 08/21/2015 | Quality Control | Concrete | View |
2015-08-17-6 | 08/17/2015 | 08/21/2015 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods