Project Details
This page displays current information for project DEA: 07215954.
Project Information
Project Identifiers | Project ID: 209141 DEA: 07215954 EFIS: 0700001835 |
---|---|
DIST-CO-RTE-PM | 07-LA-5-0.0/7.6 |
Award Date | 04/24/2014 |
Closeout Date | 07/14/2022 |
Work Description | WIDENING FREEWAY AND RECONSTRUCT OVERHEAD AND OVERCROSSING STRUCTURES |
Location Description | LOS ANGELES COUNTY IN LA MIRADA, SANTA FE SPRINGS, NORWALK AND DOWNEY FROM ORANGE COUNTY/LOS ANGELES COUNTY LIMIT LINES TO 0.7 MILE NORTH OF ROUTE 605 |
QA Service Level | 1 (Verified on 06/02/2014) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
thang.ton@dot.ca.gov | Thang Ton | Resident Engineer | Caltrans RE DB |
amare.tsegie@dot.ca.gov | Amare Tsagie | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 291-300 of 1392 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2016-02-05-8 | 02/05/2016 | 02/08/2016 | Quality Control | Concrete | View |
2016-02-05-9 | 02/05/2016 | 02/08/2016 | Quality Control | Concrete | View |
2016-02-10-8 | 02/10/2016 | 02/18/2016 | Quality Control | Concrete | View |
2016-02-10-9 | 02/10/2016 | 02/11/2016 | Quality Control | Aggregate | View |
2016-02-10-10 | 02/10/2016 | 02/11/2016 | Quality Control | Aggregate | View |
2016-02-19-4 | 02/19/2016 | 02/20/2016 | Quality Control | Aggregate | View |
2016-02-19-5 | 02/19/2016 | 02/22/2016 | Quality Control | Concrete | View |
2016-02-22-10 | 02/22/2016 | 02/23/2016 | Quality Control | Aggregate | View |
2016-02-22-11 | 02/22/2016 | 02/23/2016 | Quality Control | Concrete | View |
2016-02-25-6 | 02/25/2016 | 02/26/2016 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods