Project Details
This page displays current information for project DEA: 07215954.
Project Information
Project Identifiers | Project ID: 209141 DEA: 07215954 EFIS: 0700001835 |
---|---|
DIST-CO-RTE-PM | 07-LA-5-0.0/7.6 |
Award Date | 04/24/2014 |
Closeout Date | 07/14/2022 |
Work Description | WIDENING FREEWAY AND RECONSTRUCT OVERHEAD AND OVERCROSSING STRUCTURES |
Location Description | LOS ANGELES COUNTY IN LA MIRADA, SANTA FE SPRINGS, NORWALK AND DOWNEY FROM ORANGE COUNTY/LOS ANGELES COUNTY LIMIT LINES TO 0.7 MILE NORTH OF ROUTE 605 |
QA Service Level | 1 (Verified on 06/02/2014) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
thang.ton@dot.ca.gov | Thang Ton | Resident Engineer | Caltrans RE DB |
amare.tsegie@dot.ca.gov | Amare Tsagie | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1231-1240 of 1392 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-04-18-9 | 04/18/2018 | 04/19/2018 | Quality Control | Concrete | View |
2018-04-23-8 | 04/23/2018 | 04/24/2018 | Quality Control | Concrete | View |
2018-04-23-9 | 04/23/2018 | 04/24/2018 | Quality Control | Concrete | View |
2018-04-26-6 | 04/26/2018 | 04/27/2018 | Quality Control | Concrete | View |
2018-05-02-5 | 05/02/2018 | 05/03/2018 | Quality Control | Concrete | View |
2018-05-03-10 | 05/03/2018 | 05/04/2018 | Quality Control | Concrete | View |
2018-05-08-6 | 05/08/2018 | 05/09/2018 | Quality Control | Concrete | View |
2018-05-10-16 | 05/10/2018 | 05/11/2018 | Quality Control | Concrete | View |
2018-05-10-17 | 05/10/2018 | 05/11/2018 | Quality Control | Concrete | View |
2018-05-16-17 | 05/16/2018 | 05/17/2018 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods