Project Details
This page displays current information for project DEA: 07215954.
Project Information
Project Identifiers | Project ID: 209141 DEA: 07215954 EFIS: 0700001835 |
---|---|
DIST-CO-RTE-PM | 07-LA-5-0.0/7.6 |
Award Date | 04/24/2014 |
Closeout Date | 07/14/2022 |
Work Description | WIDENING FREEWAY AND RECONSTRUCT OVERHEAD AND OVERCROSSING STRUCTURES |
Location Description | LOS ANGELES COUNTY IN LA MIRADA, SANTA FE SPRINGS, NORWALK AND DOWNEY FROM ORANGE COUNTY/LOS ANGELES COUNTY LIMIT LINES TO 0.7 MILE NORTH OF ROUTE 605 |
QA Service Level | 1 (Verified on 06/02/2014) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
thang.ton@dot.ca.gov | Thang Ton | Resident Engineer | Caltrans RE DB |
amare.tsegie@dot.ca.gov | Amare Tsagie | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 71-80 of 1392 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2015-06-25-11 | 06/25/2015 | 06/26/2015 | Quality Control | Concrete | View |
2015-06-26-11 | 06/26/2015 | 06/27/2015 | Quality Control | Concrete | View |
2015-06-29-7 | 06/29/2015 | 06/30/2015 | Quality Control | Concrete | View |
2015-06-29-8 | 06/29/2015 | 06/30/2015 | Quality Control | Concrete | View |
2015-06-30-2 | 06/30/2015 | 06/30/2015 | Quality Control | Concrete | View |
2015-06-30-3 | 06/30/2015 | 06/30/2015 | Quality Control | Concrete | View |
2015-07-01-4 | 07/01/2015 | 07/02/2015 | Quality Control | Concrete | View |
2015-07-01-5 | 07/01/2015 | 07/02/2015 | Quality Control | Concrete | View |
2015-06-26-12 | 06/26/2015 | 06/27/2015 | Quality Control | Concrete | View |
2015-06-26-13 | 06/26/2015 | 06/27/2015 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods