Project Details
This page displays current information for project DEA: 071170U4.
Project Information
Project Identifiers | Project ID: 209139 DEA: 071170U4 EFIS: 0700000085 |
---|---|
DIST-CO-RTE-PM | 07-LA-10-33.2/37.2 |
Award Date | 02/10/2014 |
Closeout Date | 03/01/2022 |
Work Description | CONSTRUCT HOV LANES, WIDEN BRIDGES, AND REALIGN RAMPS. |
Location Description | LOS ANGELES COUNTY IN BALDWIN PARK AND WEST COVINA FROM 0.1 MILE WEST OF PUENTE AVENUE UNDERCROSSING TO 0.2 MILE EAST OF HOLLENBECK STREET UNDERCROSSING |
QA Service Level | 1 (Verified on 05/06/2014) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
raj.punjabi@dot.ca.gov | Raj Punjabi | Resident Engineer | Caltrans RE DB |
cardiel.bugarin@dot.ca.gov | Cardiel Bugarin | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 141 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2019-11-05-6 | 11/05/2019 | 11/13/2019 | Department Acceptance | Soil | View |
2019-08-08-22 | 08/08/2019 | 08/12/2019 | Quality Assurance | Concrete | View |
2019-07-26-10 | 07/26/2019 | 07/30/2019 | Quality Assurance | Concrete | View |
2019-06-23-1 | 06/23/2019 | 06/25/2019 | Verification | Aggregate | View |
2019-06-13-9 | 06/13/2019 | 06/20/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2019-06-11-12 | 06/11/2019 | 06/18/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2019-01-08-2 | 01/08/2019 | 01/14/2019 | Quality Assurance | Concrete | View |
2018-06-20-38 | 06/20/2018 | 06/25/2018 | Quality Assurance | Concrete | View |
2018-01-31-15 | 01/31/2018 | 02/02/2018 | Quality Control | Concrete | View |
2018-01-24-8 | 01/24/2018 | 01/26/2018 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods