Project Details
This page displays current information for project DEA: 04235844.
Project Information
Project Identifiers | Project ID: 209135 DEA: 04235844 EFIS: 0400000684 COOP: 042493 |
---|---|
DIST-CO-RTE-PM | 04-SM-101-16.3/17.06 |
Award Date | 06/25/2014 |
Closeout Date | 12/17/2019 |
Work Description | RECONSTRUCT OVERCROSSING, RETAINING WALLS, GROUND IMPROVEMENT, |
Location Description | BURLINGAME |
QA Service Level | 1 (Verified on 10/03/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
douglas.inori@dot.ca.gov | Douglas Inori | Resident Engineer | Caltrans RE DB |
jordan.jarosz@dot.ca.gov | Jordan Jarosz | Structural Representative | Caltrans SR DB |
saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 80 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2015-04-17-10 | 04/17/2015 | 04/29/2015 | Quality Control | Concrete | View |
2015-04-17-11 | 04/17/2015 | 04/29/2015 | Quality Control | Concrete | View |
2015-04-21-9 | 04/21/2015 | 04/29/2015 | Quality Control | Concrete | View |
2015-04-21-10 | 04/21/2015 | 04/29/2015 | Quality Control | Concrete | View |
2015-04-21-11 | 04/21/2015 | 04/29/2015 | Quality Control | Concrete | View |
2015-05-20-5 | 05/20/2015 | 05/26/2015 | Quality Control | Concrete | View |
2015-05-20-6 | 05/20/2015 | 05/26/2015 | Quality Control | Concrete | View |
2015-05-20-7 | 05/20/2015 | 05/26/2015 | Quality Control | Concrete | View |
2015-05-20-8 | 05/20/2015 | 05/26/2015 | Quality Control | Concrete | View |
2015-06-09-12 | 06/09/2015 | 06/25/2015 | Verification | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods