Project Details
This page displays current information for project DEA: 040A7104.
Project Information
Project Identifiers | Project ID: 209114 DEA: 040A7104 EFIS: 0400000160 COOP: 042550 |
---|---|
DIST-CO-RTE-PM | 04-ALA-880-28.4/29.2 |
Award Date | 04/30/2014 |
Closeout Date | 07/23/2020 |
Work Description | WIDEN ROADS, RECONSTRUCT RAMPS WITH HMA, REPLACE 2 CONC OVERCROSSINGS. |
Location Description | ALAMEDA COUNTY IN ALAMEDA AND OAKLAND FROM 0.2 MILE SOUTH OF 29TH AVENUE OVERCROSSING TO 0.3 MILE NORTH OF 23RD AVENUE OVERCROSSING. |
QA Service Level | 1 (Verified on 10/11/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
joy.k.cheung@dot.ca.gov | Joy Cheung | Resident Engineer | Caltrans RE DB |
maxime.dabilly@dot.ca.gov | Maxime Dabilly | Structural Representative | Caltrans SR DB |
saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 61-70 of 146 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2016-01-28-15 | 01/28/2016 | 02/25/2016 | Quality Control | Concrete | View |
2016-01-28-16 | 01/28/2016 | 02/25/2016 | Quality Control | Concrete | View |
2016-02-23-2 | 02/23/2016 | 02/25/2016 | Quality Control | Concrete | View |
2016-02-09-5 | 02/09/2016 | 02/25/2016 | Quality Control | Concrete | View |
2016-03-24-6 | 03/24/2016 | 04/06/2016 | Quality Assurance | Concrete | View |
2016-03-30-5 | 03/30/2016 | 04/06/2016 | Quality Assurance | Concrete | View |
2016-04-11-5 | 04/11/2016 | 04/18/2016 | Quality Control | Concrete | View |
2016-04-21-10 | 04/21/2016 | 05/18/2016 | Quality Assurance | Concrete | View |
2016-04-21-11 | 04/21/2016 | 05/18/2016 | Quality Assurance | Concrete | View |
2016-05-16-4 | 05/16/2016 | 05/18/2016 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods