Project Details
This page displays current information for project DEA: 040A7104.
Project Information
Project Identifiers | Project ID: 209114 DEA: 040A7104 EFIS: 0400000160 COOP: 042550 |
---|---|
DIST-CO-RTE-PM | 04-ALA-880-28.4/29.2 |
Award Date | 04/30/2014 |
Closeout Date | 07/23/2020 |
Work Description | WIDEN ROADS, RECONSTRUCT RAMPS WITH HMA, REPLACE 2 CONC OVERCROSSINGS. |
Location Description | ALAMEDA COUNTY IN ALAMEDA AND OAKLAND FROM 0.2 MILE SOUTH OF 29TH AVENUE OVERCROSSING TO 0.3 MILE NORTH OF 23RD AVENUE OVERCROSSING. |
QA Service Level | 1 (Verified on 10/11/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
joy.k.cheung@dot.ca.gov | Joy Cheung | Resident Engineer | Caltrans RE DB |
maxime.dabilly@dot.ca.gov | Maxime Dabilly | Structural Representative | Caltrans SR DB |
saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 146 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2019-02-08-6 | 02/08/2019 | 02/26/2019 | Quality Assurance | Concrete | View |
2019-01-30-4 | 01/30/2019 | 02/26/2019 | Quality Assurance | Concrete | View |
2019-01-27-1 | 01/27/2019 | 02/26/2019 | Quality Assurance | Concrete | View |
2019-01-20-1 | 01/20/2019 | 01/22/2019 | Quality Assurance | Concrete | View |
2019-01-17-1 | 01/17/2019 | 01/22/2019 | Quality Assurance | Concrete | View |
2018-11-20-9 | 11/20/2018 | 11/26/2018 | Quality Assurance | Concrete | View |
2018-11-20-8 | 11/20/2018 | 11/26/2018 | Quality Assurance | Concrete | View |
2018-11-17-3 | 11/17/2018 | 11/26/2018 | Quality Assurance | Concrete | View |
2018-11-17-2 | 11/17/2018 | 11/26/2018 | Quality Assurance | Concrete | View |
2018-10-31-10 | 10/31/2018 | 11/05/2018 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods