Project Details
This page displays current information for project DEA: 040A7104.
Project Information
Project Identifiers | Project ID: 209114 DEA: 040A7104 EFIS: 0400000160 COOP: 042550 |
---|---|
DIST-CO-RTE-PM | 04-ALA-880-28.4/29.2 |
Award Date | 04/30/2014 |
Closeout Date | 07/23/2020 |
Work Description | WIDEN ROADS, RECONSTRUCT RAMPS WITH HMA, REPLACE 2 CONC OVERCROSSINGS. |
Location Description | ALAMEDA COUNTY IN ALAMEDA AND OAKLAND FROM 0.2 MILE SOUTH OF 29TH AVENUE OVERCROSSING TO 0.3 MILE NORTH OF 23RD AVENUE OVERCROSSING. |
QA Service Level | 1 (Verified on 10/11/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
joy.k.cheung@dot.ca.gov | Joy Cheung | Resident Engineer | Caltrans RE DB |
maxime.dabilly@dot.ca.gov | Maxime Dabilly | Structural Representative | Caltrans SR DB |
saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 146 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2014-09-04-4 | 09/04/2014 | 09/05/2014 | Quality Control | Concrete | View |
2014-09-04-5 | 09/04/2014 | 09/05/2014 | Quality Control | Concrete | View |
2015-01-27-2 | 01/27/2015 | 02/09/2015 | Quality Control | Concrete | View |
2015-01-30-1 | 01/30/2015 | 02/09/2015 | Quality Control | Concrete | View |
2015-02-13-2 | 02/13/2015 | 02/20/2015 | Quality Control | Concrete | View |
2015-02-18-1 | 02/18/2015 | 02/20/2015 | Quality Control | Concrete | View |
2015-02-26-5 | 02/26/2015 | 03/09/2015 | Verification | Concrete | View |
2015-03-04-9 | 03/04/2015 | 04/06/2015 | Quality Control | Concrete | View |
2015-03-13-11 | 03/13/2015 | 04/06/2015 | Quality Control | Concrete | View |
2015-03-24-5 | 03/24/2015 | 04/06/2015 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods