Project Details
This page displays current information for project DEA: 043G9004.
Project Information
Project Identifiers | Project ID: 209109 DEA: 043G9004 EFIS: 0412000557 COOP: 042513 |
---|---|
DIST-CO-RTE-PM | 04-SON-116,121-46.0/46.7,5.8/R7.4 |
Award Date | 07/31/2023 |
Closeout Date | Not set |
Work Description | MODIFY EXISTING STATE ROUTE 116,121 BONNEAU ROAD INTERSECTION FROM A 4 WAY STOP CONTROLLED INTERSECTION TO A ROUNDABOUT AND SIGNALIZED INTERSECTION. |
Location Description | SONOMA COUNTY |
QA Service Level | 1 (Verified on 08/15/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
fabio.laserna@dot.ca.gov | Fabio La Serna | Resident Engineer | Caltrans RE DB |
waqas.ather@dot.ca.gov | Waqas Ather | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 57 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-10-25-71 | 10/25/2024 | 10/25/2024 | Quality Assurance | Soil | View |
2024-10-25-70 | 10/25/2024 | 10/25/2024 | Quality Assurance | Soil | View |
2024-10-15-95 | 10/15/2024 | 10/15/2024 | Quality Assurance | Soil | View |
2024-10-15-94 | 10/15/2024 | 10/15/2024 | Quality Assurance | Soil | View |
2024-10-15-92 | 10/15/2024 | 10/15/2024 | Quality Assurance | Soil | View |
2024-10-10-101 | 10/10/2024 | 10/10/2024 | Quality Assurance | Soil | View |
2024-10-04-105 | 10/04/2024 | 10/04/2024 | Quality Assurance | Soil | View |
2024-10-04-104 | 10/04/2024 | 10/04/2024 | Quality Assurance | Soil | View |
2024-09-30-104 | 09/30/2024 | 09/30/2024 | Quality Assurance | Soil | View |
2024-09-30-103 | 09/30/2024 | 09/30/2024 | Quality Assurance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods