Project Details
This page displays current information for project DEA: 120H1004.
Project Information
Project Identifiers | Project ID: 208973 DEA: 120H1004 EFIS: 1200000180 COOP: 120670 |
---|---|
DIST-CO-RTE-PM | 12-ORA-405,73,405,605-9.3/24.3 |
Award Date | 11/07/2016 |
Closeout Date | Not set |
Work Description | (Alternative Delivery) San Diego Freeway (I-405) Improvement Project SR-73 to I-605, Design Build Project, Administered by Orange County Transportation Authority, Caltrans METS to perform Source Inspection per RFP. |
Location Description | Orange and Los Angeles Counties: 12-ORA-405 PM 9.3/24.2 / 07-LA-405 PM 0.0/1.2 12-ORA-22 PM R0.7/R3.8 / 12-ORA-22 PM R0.5/R0.7 12-ORA-73 PM R27.2/R27.8 / 12-ORA-605 PM 3.5/R1.6 07-LA-605 PM R0.0/R1.2 |
QA Service Level | 1 (Verified on 09/10/2015) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
halonso@HNTB.com | Hank Alonso (reports) | Resident Engineer | Caltrans RE DB |
Alex.Angha@jacobs.com | Alex Angha (reports) | Structural Representative | Caltrans SR DB |
james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 231-240 of 402 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-11-09-25 | 11/09/2022 | 11/10/2022 | Quality Assurance | Concrete | View |
2022-11-10-45 | 11/10/2022 | 11/11/2022 | Quality Assurance | Concrete | View |
2022-12-19-5 | 12/19/2022 | 12/19/2022 | Quality Assurance | Concrete | View |
2022-12-20-12 | 12/20/2022 | 12/20/2022 | Quality Assurance | Concrete | View |
2022-12-21-13 | 12/21/2022 | 12/21/2022 | Quality Assurance | Concrete | View |
2022-12-22-10 | 12/22/2022 | 12/22/2022 | Quality Assurance | Concrete | View |
2022-12-22-29 | 12/22/2022 | 12/23/2022 | Quality Assurance | Concrete | View |
2022-12-28-4 | 12/28/2022 | 12/28/2022 | Quality Assurance | Concrete | View |
2023-01-10-9 | 01/10/2023 | 01/12/2023 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2023-01-11-1 | 01/11/2023 | 01/17/2023 | Quality Assurance | SMTL TM5 - Headed Bars | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods