Project Details
This page displays current information for project DEA: 120H1004.
Project Information
Project Identifiers | Project ID: 208973 DEA: 120H1004 EFIS: 1200000180 COOP: 120670 |
---|---|
DIST-CO-RTE-PM | 12-ORA-405,73,405,605-9.3/24.3 |
Award Date | 11/07/2016 |
Closeout Date | Not set |
Work Description | (Alternative Delivery) San Diego Freeway (I-405) Improvement Project SR-73 to I-605, Design Build Project, Administered by Orange County Transportation Authority, Caltrans METS to perform Source Inspection per RFP. |
Location Description | Orange and Los Angeles Counties: 12-ORA-405 PM 9.3/24.2 / 07-LA-405 PM 0.0/1.2 12-ORA-22 PM R0.7/R3.8 / 12-ORA-22 PM R0.5/R0.7 12-ORA-73 PM R27.2/R27.8 / 12-ORA-605 PM 3.5/R1.6 07-LA-605 PM R0.0/R1.2 |
QA Service Level | 1 (Verified on 09/10/2015) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
halonso@HNTB.com | Hank Alonso (reports) | Resident Engineer | Caltrans RE DB |
Alex.Angha@jacobs.com | Alex Angha (reports) | Structural Representative | Caltrans SR DB |
james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 131-140 of 402 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-09-02-18 | 09/02/2020 | 09/15/2020 | Quality Assurance | SMTL TM5 - Couplers | View |
2020-09-08-3 | 09/08/2020 | 09/09/2020 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2020-09-08-5 | 09/08/2020 | 09/09/2020 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2020-09-10-1 | 09/10/2020 | 09/14/2020 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2020-09-17-9 | 09/17/2020 | 09/21/2020 | Verification | Concrete | View |
2020-09-22-18 | 09/22/2020 | 09/29/2020 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2020-09-22-19 | 09/22/2020 | 10/01/2020 | Verification | SMTL TM5 - Couplers | View |
2020-09-28-38 | 09/28/2020 | 10/01/2020 | Verification | SMTL TM5 - Couplers | View |
2020-10-07-12 | 10/07/2020 | 10/12/2020 | Quality Assurance | SMTL TM4 - Prestressing Strand | View |
2020-10-08-5 | 10/08/2020 | 10/14/2020 | Quality Assurance | SMTL TM5 - Headed Bars | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods