Project Details
This page displays current information for project DEA: 07288604.
Project Information
Project Identifiers | Project ID: 208945 DEA: 07288604 EFIS: 0700021080 COOP: 074663 |
---|---|
DIST-CO-RTE-PM | 07-LA-710-6.0-9.4 |
Award Date | 09/02/2011 |
Closeout Date | Not set |
Work Description | Gerald Desmond Bridge Replacement - A Design Build project. IQA samples will be selected by Port/Caltrans representatives and sent to Translab for testing. |
Location Description | Port of Long Beach (District 7) |
QA Service Level | 1 (Verified on 06/03/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
sami.deeb@dot.ca.gov | Sami Deeb | Structural Representative | Caltrans SR DB |
jeffrey.yu@dot.ca.gov | Jeffrey Yu | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 511 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2016-08-05-7 | 08/05/2016 | 08/09/2016 | Quality Assurance | SMTL TM7 - Epoxy Coated Rebar | View |
2016-10-14-8 | 10/14/2016 | 11/02/2016 | Quality Assurance | SMTL TM7 - Epoxy Coated Rebar | View |
2017-01-25-1 | 01/25/2017 | 01/26/2017 | Quality Assurance | SMTL TM7 - Epoxy Coated Rebar | View |
2017-02-28-6 | 02/28/2017 | 03/02/2017 | Department Acceptance | SMTL TM7 - Epoxy Coated Rebar | View |
2017-06-23-8 | 06/23/2017 | Independent Assurance | SMTL TM7 - Epoxy Coated Rebar | View | |
2017-07-07-2 | 07/07/2017 | 06/30/2017 | Quality Assurance | SMTL TM7 - Epoxy Coated Rebar | View |
2017-11-06-3 | 11/06/2017 | 11/09/2017 | Independent Assurance | SMTL TM7 - Epoxy Coated Rebar | View |
2018-05-31-6 | 05/31/2018 | 06/05/2018 | Independent Assurance | SMTL TM7 - Epoxy Coated Rebar | View |
2018-10-10-1 | 10/10/2018 | 10/11/2018 | Quality Assurance | SMTL TM7 - Epoxy Coated Rebar | View |
2018-10-10-2 | 10/10/2018 | 10/11/2018 | Independent Assurance | SMTL TM7 - Epoxy Coated Rebar | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods