Project Details

This page displays current information for project DEA: 040A5344.

Project Information

Project IdentifiersProject ID: 208852
DEA: 040A5344
EFIS: 0400021131
COOP: 042491
DIST-CO-RTE-PM04-SOL-80,80-R11.4/13.0
Award Date03/19/2014
Closeout Date10/12/2018
Work DescriptionREALIGN I-680 TO CONNECT DIRECTLY WITH THE I-80/SR-12 INTERCHANGE.
Location DescriptionIN SOLANO COUNTY NEAR FAIRFIELD.
QA Service Level1 (Verified on 10/17/2013)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
noel.aquino@dot.ca.govNoel AQUINOResident EngineerCaltrans RE DB
ryan.stiltz@dot.ca.govRyan StiltzStructural RepresentativeCaltrans SR DB

Samples

Samples submitted for this project.

Displaying 61-70 of 158 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2015-06-25-906/25/201506/29/2015Quality ControlConcreteView
2015-06-26-306/26/201506/29/2015Quality ControlConcreteView
2015-06-26-406/26/201506/29/2015Quality ControlConcreteView
2015-06-26-506/26/201506/29/2015Quality ControlConcreteView
2015-06-26-606/26/201506/30/2015Quality ControlConcreteView
2015-07-02-307/02/201507/03/2015VerificationConcreteView
2015-07-10-707/10/201507/23/2015VerificationConcreteView
2015-07-15-307/15/201507/16/2015Quality ControlConcreteView
2015-07-21-407/21/201507/23/2015VerificationConcreteView
2015-07-22-307/22/201507/23/2015VerificationConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods