Project Details
This page displays current information for project DEA: 040A5344.
Project Information
Project Identifiers | Project ID: 208852 DEA: 040A5344 EFIS: 0400021131 COOP: 042491 |
---|---|
DIST-CO-RTE-PM | 04-SOL-80,80-R11.4/13.0 |
Award Date | 03/19/2014 |
Closeout Date | 10/12/2018 |
Work Description | REALIGN I-680 TO CONNECT DIRECTLY WITH THE I-80/SR-12 INTERCHANGE. |
Location Description | IN SOLANO COUNTY NEAR FAIRFIELD. |
QA Service Level | 1 (Verified on 10/17/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
noel.aquino@dot.ca.gov | Noel AQUINO | Resident Engineer | Caltrans RE DB |
ryan.stiltz@dot.ca.gov | Ryan Stiltz | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 61-70 of 158 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2015-06-25-9 | 06/25/2015 | 06/29/2015 | Quality Control | Concrete | View |
2015-06-26-3 | 06/26/2015 | 06/29/2015 | Quality Control | Concrete | View |
2015-06-26-4 | 06/26/2015 | 06/29/2015 | Quality Control | Concrete | View |
2015-06-26-5 | 06/26/2015 | 06/29/2015 | Quality Control | Concrete | View |
2015-06-26-6 | 06/26/2015 | 06/30/2015 | Quality Control | Concrete | View |
2015-07-02-3 | 07/02/2015 | 07/03/2015 | Verification | Concrete | View |
2015-07-15-3 | 07/15/2015 | 07/16/2015 | Quality Control | Concrete | View |
2015-07-10-7 | 07/10/2015 | 07/23/2015 | Verification | Concrete | View |
2015-07-21-4 | 07/21/2015 | 07/23/2015 | Verification | Concrete | View |
2015-07-22-3 | 07/22/2015 | 07/23/2015 | Verification | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods