Project Details
This page displays current information for project DEA: 040A5344.
Project Information
Project Identifiers | Project ID: 208852 DEA: 040A5344 EFIS: 0400021131 COOP: 042491 |
---|---|
DIST-CO-RTE-PM | 04-SOL-80,80-R11.4/13.0 |
Award Date | 03/19/2014 |
Closeout Date | 10/12/2018 |
Work Description | REALIGN I-680 TO CONNECT DIRECTLY WITH THE I-80/SR-12 INTERCHANGE. |
Location Description | IN SOLANO COUNTY NEAR FAIRFIELD. |
QA Service Level | 1 (Verified on 10/17/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
noel.aquino@dot.ca.gov | Noel AQUINO | Resident Engineer | Caltrans RE DB |
ryan.stiltz@dot.ca.gov | Ryan Stiltz | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 158 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2014-12-10-4 | 12/10/2014 | 12/11/2014 | Quality Control | Concrete | View |
2014-12-22-1 | 12/22/2014 | 12/24/2014 | Quality Control | Concrete | View |
2015-01-19-1 | 01/19/2015 | 01/20/2015 | Quality Control | Concrete | View |
2015-01-19-2 | 01/19/2015 | 01/20/2015 | Quality Control | Concrete | View |
2015-02-02-5 | 02/02/2015 | 02/03/2015 | Verification | Concrete | View |
2015-02-02-6 | 02/02/2015 | 02/03/2015 | Verification | Concrete | View |
2015-02-27-4 | 02/27/2015 | 03/02/2015 | Quality Control | Concrete | View |
2015-02-27-5 | 02/27/2015 | 03/02/2015 | Quality Control | Concrete | View |
2014-12-04-5 | 12/04/2014 | 03/11/2015 | Annual Source Testing | Aggregate | View |
2014-12-08-11 | 12/08/2014 | 03/11/2015 | Annual Source Testing | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods