Project Details
This page displays current information for project DEA: 083401U4.
Project Information
Project Identifiers | Project ID: 208682 DEA: 083401U4 EFIS: 0800000609 |
---|---|
DIST-CO-RTE-PM | 08-SBD-138,138-6.2/6.4,2.3/R15.2 |
Award Date | 09/10/2014 |
Closeout Date | 06/23/2021 |
Work Description | WIDEN TO 4 LNS FR BEEKLEY RD TO JCT 15, ADD 1 LN EB FR PHELAN RD TO |
Location Description | SAN BERNARDINO COUNTY ON ROUTE 138 NEAR PHELAN FROM 0.6 MILE WEST OF PHELAN ROAD TO THE JUNCTION OF ROUTE 15 AND ON ROUTE 2 FROM 0.1 MILE NORTH OF WILD HORSE CANYON ROAD TO ROUTE 138 |
QA Service Level | 1 (Verified on 03/11/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Osama.Abdalla@dot.ca.gov | Osama Abdalla | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 88 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2017-04-20-10 | 04/20/2017 | 04/24/2017 | Quality Control | Concrete | View |
2017-04-19-11 | 04/19/2017 | 04/24/2017 | Quality Control | Concrete | View |
2017-03-22-9 | 03/22/2017 | 04/05/2017 | Quality Control | Concrete | View |
2017-03-07-4 | 03/07/2017 | 03/14/2017 | Quality Control | Concrete | View |
2017-03-06-5 | 03/06/2017 | 03/08/2017 | Quality Control | Concrete | View |
2017-02-01-8 | 02/01/2017 | 02/20/2017 | Quality Control | Concrete | View |
2017-02-13-3 | 02/13/2017 | 01/11/2017 | Quality Assurance | Polyester | View |
2016-12-07-4 | 12/07/2016 | 12/09/2016 | Quality Assurance | Concrete | View |
2016-11-23-3 | 11/23/2016 | 12/02/2016 | Quality Assurance | Concrete | View |
2016-09-26-8 | 09/26/2016 | 09/26/2016 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods