Project Details
This page displays current information for project DEA: 100S1104.
Project Information
Project Identifiers | Project ID: 208679 DEA: 100S1104 EFIS: 1000000229 COOP: 10406 |
---|---|
DIST-CO-RTE-PM | 10-SJ-4,5-Var |
Award Date | 12/16/2013 |
Closeout Date | 01/03/2019 |
Work Description | SR-4 FREEWAY EXTENSION |
Location Description | IN SAN JOAQUIN COUNTY |
QA Service Level | 1 (Verified on 03/25/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
harminder.deol@dot.ca.gov | Harminder Deol | Resident Engineer | Caltrans RE DB |
alejandro.lara@dot.ca.gov | Alex Lara | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 35 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2016-08-30-1 | 08/30/2016 | 08/31/2016 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2016-08-30-2 | 08/30/2016 | 08/31/2016 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2014-08-12-1 | 08/12/2014 | 08/15/2014 | Quality Control | Concrete | View |
2014-08-19-1 | 08/19/2014 | 08/22/2014 | Quality Control | Concrete | View |
2014-08-19-2 | 08/19/2014 | 08/22/2014 | Quality Control | Concrete | View |
2014-08-19-3 | 08/19/2014 | 08/22/2014 | Quality Control | Concrete | View |
2014-08-19-4 | 08/19/2014 | 08/22/2014 | Quality Control | Concrete | View |
2014-08-20-11 | 08/20/2014 | 08/22/2014 | Quality Control | Concrete | View |
2014-08-20-12 | 08/20/2014 | 08/22/2014 | Quality Control | Concrete | View |
2014-08-20-13 | 08/20/2014 | 08/22/2014 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods