Project Details
This page displays current information for project DEA: 100L3304.
Project Information
Project Identifiers | Project ID: 208572 DEA: 100L3304 EFIS: 1000000100 COOP: 10355 Permit Numbers: 1012NMC0508 |
---|---|
DIST-CO-RTE-PM | 10-STA-99-0.0/0.3 |
Award Date | Not set |
Closeout Date | 03/09/2020 |
Work Description | Reconsteuct SR99/Kiernan Interchange |
Location Description | City of Salida, in STA County |
QA Service Level | 1 (Verified on 03/25/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
steve.sakata@dot.ca.gov | Steve Sakata | Resident Engineer | Caltrans RE DB |
Stephen.Walters@nv5.com | Stephen Walters | Oversight Resident Engineer | Caltrans REO DB |
kelvin.low@dot.ca.gov | Kelvin Low | Structural Representative | Caltrans SR DB |
brad.riel@nv5.com | Brad Riel | Oversight Structural Representative | Caltrans SRO DB |
Samples
Samples submitted for this project.
Displaying 31-37 of 37 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2014-02-18-12000218 | 02/18/2014 | 02/19/2014 | Informational | Concrete | View |
2014-02-05-12002051 | 02/05/2014 | 02/07/2014 | Informational | Concrete | View |
2014-02-04-12002722 | 02/04/2014 | 02/05/2014 | Informational | Concrete | View |
2014-02-24-12004325 | 02/24/2014 | 02/25/2014 | Informational | Concrete | View |
2014-02-12-12002345 | 02/12/2014 | 02/13/2014 | Informational | Concrete | View |
2014-02-26-12008219 | 02/26/2014 | 02/27/2014 | Informational | Concrete | View |
2014-02-13-12002035 | 02/13/2014 | 02/14/2014 | Informational | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods