Project Details
This page displays current information for project DEA: 042490A4.
Project Information
Project Identifiers | Project ID: 2049 DEA: 042490A4 EFIS: 0400000700 |
---|---|
DIST-CO-RTE-PM | 04-ALA-238,880-R14.5/16.5,20.3/20.8 |
Award Date | 12/21/2010 |
Closeout Date | 07/17/2015 |
Work Description | PERFORM HIGHWAY PLANTING AND INSTALL IRRIGATION SYSTEM |
Location Description | ALAMEDA COUNTY IN HAYWARD SAN LEANDRO AND ASHLAND ON ROUTE 880 FROM THE LEWELLING BOULEVARD TO 0.1 MILE EAST OF THE WASHINGTON AVENUE AND ON ROUTE 238 FROM ROUTE 880/238 SEPARATION TO APPLE AVENUE |
QA Service Level | 1 (Verified on 10/04/2010) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods