Project Details
This page displays current information for project DEA: 040120L4.
Project Information
Project Identifiers | Project ID: 1343 DEA: 040120L4 EFIS: 0400000020 COOP: 042304 |
---|---|
DIST-CO-RTE-PM | 04-ALA-80-1.6/2.7 |
Award Date | 07/16/2007 |
Closeout Date | 02/08/2018 |
Work Description | SFOBB Runoff Mitigation |
Location Description | From the newly built East span of the San Francisco-Oakland Bay Bridge (SFOBB), said East span having been built as part of SFOBB Seismic Safety Project |
QA Service Level | 1 (Verified on 03/22/2011) |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs submitted for this project.
Declaration Number | Program Operator | Material Type | Vendor | Submitted by |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods