Project Details
This page displays current information for project DEA: 07341304.
Project Information
Project Identifiers | Project ID: 1000357 DEA: 07341304 EFIS: 0717000187 |
---|---|
DIST-CO-RTE-PM | 07--- |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Not set |
Location Description | Not set |
QA Service Level | 2 (Verified on 12/03/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
francisco.martinez@dot.ca.gov | Francisco J Martinez | Resident Engineer | Caltrans RE DB |
lababidib@metro.net | Belal Lababidi | Oversight Resident Engineer | Caltrans REO DB |
jeffrey.yu@dot.ca.gov | Jeffrey Yu | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 22 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2025-01-20-29 | 01/20/2025 | 01/20/2025 | Quality Assurance | SMTL TM7 - Epoxy Coated Rebar | View |
2025-01-20-28 | 01/20/2025 | 01/20/2025 | Quality Assurance | SMTL TM7 - Epoxy Coated Rebar | View |
2025-01-20-27 | 01/20/2025 | 01/20/2025 | Quality Assurance | SMTL TM7 - Epoxy Coated Rebar | View |
2025-01-20-26 | 01/20/2025 | 01/20/2025 | Quality Assurance | SMTL TM7 - Epoxy Coated Rebar | View |
2025-01-20-24 | 01/20/2025 | 01/20/2025 | Quality Assurance | SMTL TM7 - Epoxy Coated Rebar | View |
2024-11-21-62 | 11/21/2024 | 11/21/2024 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2024-11-21-61 | 11/21/2024 | 11/21/2024 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2024-10-21-92 | 10/21/2024 | 10/21/2024 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2024-10-21-91 | 10/21/2024 | 10/21/2024 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2024-10-21-90 | 10/21/2024 | 10/21/2024 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Precast Concrete Forms
Project DEA | DIME Sample ID | Sample Taken Date | Link |
---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods