Project Details

This page displays current information for project DEA: 081N7504.

Project Information

Project IdentifiersProject ID: 1000255
DEA: 081N7504
EFIS: 0823000045
DIST-CO-RTE-PM08-SBD-138,189-21.4/R37.8,0.0/5.6
Award Date06/12/2024
Closeout DateNot set
Work DescriptionSLURRY SEAL, TWO-COMPONENT PAINT TRAFFIC STRIPE, REPLACE AC SURFACING.
Location DescriptionSAN BERNARDINO COUNTY ON ROUTE 138 FROM BOLINGBROKE ROAD TO ROUTE 18 AND ON ROUTE 189 FROM ROUTE 18 TO ROUTE 173
QA Service Level1 (Verified on 05/15/2024)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
md.rahman@dot.ca.govMd RahmanResident EngineerCaltrans RE DB
joshua.fry@dot.ca.govJoshua FryMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-9 of 9 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2024-10-11-5810/11/202410/11/2024AcceptanceAggregateView
2024-10-10-4210/10/202410/10/2024AcceptanceAggregateView
2024-10-11-1610/11/202410/14/2024AcceptanceHot Mix AsphaltView
2024-10-10-1210/10/202410/11/2024AcceptanceHot Mix AsphaltView
2024-09-23-6809/23/202409/25/2024VerificationAsphalt BinderView
2024-09-25-709/25/202409/25/2024AcceptanceHot Mix AsphaltView
2024-09-24-3209/24/202409/25/2024AcceptanceHot Mix AsphaltView
2024-09-23-1809/23/202409/24/2024VerificationAggregateView
2024-09-23-409/23/202409/23/2024Production Start-UpHot Mix AsphaltView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods