Project Details
This page displays current information for project DEA: 081N7504.
Project Information
Project Identifiers | Project ID: 1000255 DEA: 081N7504 EFIS: 0823000045 |
---|---|
DIST-CO-RTE-PM | 08-SBD-138,189-21.4/R37.8,0.0/5.6 |
Award Date | 06/12/2024 |
Closeout Date | Not set |
Work Description | SLURRY SEAL, TWO-COMPONENT PAINT TRAFFIC STRIPE, REPLACE AC SURFACING. |
Location Description | SAN BERNARDINO COUNTY ON ROUTE 138 FROM BOLINGBROKE ROAD TO ROUTE 18 AND ON ROUTE 189 FROM ROUTE 18 TO ROUTE 173 |
QA Service Level | 1 (Verified on 05/15/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
md.rahman@dot.ca.gov | Md Rahman | Resident Engineer | Caltrans RE DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-9 of 9 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-10-11-58 | 10/11/2024 | 10/11/2024 | Acceptance | Aggregate | View |
2024-10-10-42 | 10/10/2024 | 10/10/2024 | Acceptance | Aggregate | View |
2024-10-11-16 | 10/11/2024 | 10/14/2024 | Acceptance | Hot Mix Asphalt | View |
2024-10-10-12 | 10/10/2024 | 10/11/2024 | Acceptance | Hot Mix Asphalt | View |
2024-09-23-68 | 09/23/2024 | 09/25/2024 | Verification | Asphalt Binder | View |
2024-09-25-7 | 09/25/2024 | 09/25/2024 | Acceptance | Hot Mix Asphalt | View |
2024-09-24-32 | 09/24/2024 | 09/25/2024 | Acceptance | Hot Mix Asphalt | View |
2024-09-23-18 | 09/23/2024 | 09/24/2024 | Verification | Aggregate | View |
2024-09-23-4 | 09/23/2024 | 09/23/2024 | Production Start-Up | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods