Project Details
This page displays current information for project DEA: 081G6304.
Project Information
Project Identifiers | Project ID: 1000216 DEA: 081G6304 EFIS: 0816000043 |
---|---|
DIST-CO-RTE-PM | 08-RIV-111-47.2/55.3 |
Award Date | 09/05/2024 |
Closeout Date | Not set |
Work Description | RHMA-G, REPLACE AC SURFACING, AND COLD PLANE AC PVMT. |
Location Description | RIVERSIDE COUNTY IN PALM SPRINGS FROM GOLF CLUB DRIVE TO WEST GATEWAY DRIVE |
QA Service Level | 1 (Verified on 05/15/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
francisco.montellano@dot.ca.gov | Francisco Montellano | Resident Engineer | Caltrans RE DB |
mohamad.abu.hilal@dot.ca.gov | Mohamad Abu-Hilal | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 61 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-10-30-49 | 10/30/2024 | 11/21/2024 | Acceptance | Hot Mix Asphalt | View |
2025-03-03-9 | 03/03/2025 | 03/05/2025 | Acceptance | Hot Mix Asphalt | View |
2025-03-04-23 | 03/04/2025 | 03/05/2025 | Acceptance | Hot Mix Asphalt | View |
2025-03-05-4 | 03/05/2025 | 03/06/2025 | Acceptance | Hot Mix Asphalt | View |
2025-02-20-35 | 02/20/2025 | 03/11/2025 | Acceptance | Hot Mix Asphalt | View |
2025-02-21-32 | 02/21/2025 | 03/11/2025 | Acceptance | Hot Mix Asphalt | View |
2025-02-24-49 | 02/24/2025 | 03/11/2025 | Acceptance | Hot Mix Asphalt | View |
2025-03-10-6 | 03/10/2025 | 03/11/2025 | Acceptance | Hot Mix Asphalt | View |
2025-03-12-4 | 03/12/2025 | 03/13/2025 | Acceptance | Hot Mix Asphalt | View |
2025-03-17-4 | 03/17/2025 | 03/18/2025 | Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Precast Concrete Forms
Project DEA | DIME Sample ID | Sample Taken Date | Link |
---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods