Project Details
This page displays current information for project DEA: 081G6304.
Project Information
Project Identifiers | Project ID: 1000216 DEA: 081G6304 EFIS: 0816000043 |
---|---|
DIST-CO-RTE-PM | 08-RIV-111-47.2/55.3 |
Award Date | 09/05/2024 |
Closeout Date | Not set |
Work Description | RHMA-G, REPLACE AC SURFACING, AND COLD PLANE AC PVMT. |
Location Description | RIVERSIDE COUNTY IN PALM SPRINGS FROM GOLF CLUB DRIVE TO WEST GATEWAY DRIVE |
QA Service Level | 1 (Verified on 05/15/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 12 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-10-30-55 | 10/30/2024 | 11/21/2024 | Verification | Asphalt Rubber Binder | View |
2024-10-30-54 | 10/30/2024 | 11/21/2024 | Verification | Asphalt Binder | View |
2024-10-30-52 | 10/30/2024 | 11/21/2024 | Verification | Crumb Rubber Modifier | View |
2024-10-30-51 | 10/30/2024 | 11/21/2024 | Verification | Crumb Rubber Modifier | View |
2024-10-30-50 | 10/30/2024 | 11/21/2024 | Verification | Aggregate | View |
2024-10-30-49 | 10/30/2024 | 11/21/2024 | Acceptance | Hot Mix Asphalt | View |
2024-11-05-20 | 11/05/2024 | 11/07/2024 | Verification | Asphalt Binder | View |
2024-11-05-14 | 11/05/2024 | 11/07/2024 | Verification | Hot Mix Asphalt | View |
2024-11-05-13 | 11/05/2024 | 11/07/2024 | Verification | Aggregate | View |
2024-10-09-68 | 10/09/2024 | 10/17/2024 | Verification | Asphalt Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods