Project Details
This page displays current information for project DEA: 07346004.
Project Information
Project Identifiers | Project ID: 1000208 DEA: 07346004 EFIS: 0718000070 |
---|---|
DIST-CO-RTE-PM | 07-LA-101-11.0/23.5 |
Award Date | 07/12/2024 |
Closeout Date | Not set |
Work Description | CONSTRUCT MVPS, PAVE BEYOND THE GORE, INSTALL GATES & CABLE RAILING. |
Location Description | LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM NORTH OF VINELAND AVENUE TO NORTH OF WINNETKA AVENUE |
QA Service Level | 1 (Verified on 04/24/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
vladimir.gurfinkel@dot.ca.gov | VLADIMIR GURFINKEL | Resident Engineer | Caltrans RE DB |
keivan.hassan@dot.ca.gov | Keivan Hassan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 10 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-12-28-1 | 12/28/2024 | 12/28/2024 | Acceptance | Soil | View |
2024-12-28-2 | 12/28/2024 | 12/28/2024 | Acceptance | Soil | View |
2024-12-23-24 | 12/23/2024 | 12/23/2024 | Acceptance | Soil | View |
2024-12-23-25 | 12/23/2024 | 12/23/2024 | Acceptance | Soil | View |
2025-01-10-8 | 01/10/2025 | 01/11/2025 | Acceptance | Soil | View |
2025-01-10-9 | 01/10/2025 | 01/11/2025 | Acceptance | Soil | View |
2025-01-22-1 | 01/22/2025 | 01/16/2025 | Acceptance | Concrete | View |
2024-12-24-4 | 12/24/2024 | 12/24/2024 | Acceptance | Soil | View |
2024-12-24-5 | 12/24/2024 | 12/24/2024 | Acceptance | Soil | View |
2025-01-14-39 | 01/14/2025 | 01/14/2025 | Acceptance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods