Project Details
This page displays current information for project DEA: 034H76U4.
Project Information
Project Identifiers | Project ID: 1000176 DEA: 034H76U4 EFIS: 0323000040 |
---|---|
DIST-CO-RTE-PM | 03-BUT-32-5.0/10.2 |
Award Date | 06/17/2024 |
Closeout Date | Not set |
Work Description | REHABILITATE PAVEMENT, INSTALL SIGNAL, LIGHTING, DRAINAGE, & ADA RAMPS |
Location Description | BUTTE COUNTY IN CHICO FROM MUIR AVENUE TO INTERCHANGE OF STATE ROUTES 99 AND 32 |
QA Service Level | 1 (Verified on 04/18/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
michael.mattson@dot.ca.gov | Michael Mattson | Resident Engineer | Caltrans RE DB |
farzan.kazemi@dot.ca.gov | Farzan Kazemi | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 10 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2025-05-28-75 | 05/28/2025 | 06/03/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-06-04-41 | 06/04/2025 | 06/06/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-06-08-12 | 06/08/2025 | 06/11/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-06-10-41 | 06/10/2025 | 06/11/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-06-12-63 | 06/12/2025 | 06/17/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-06-17-62 | 06/17/2025 | 06/19/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-07-07-35 | 07/07/2025 | 07/09/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-07-15-43 | 07/15/2025 | 07/16/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-07-15-40 | 07/15/2025 | 07/17/2025 | Verification | Asphaltic Emulsion | View |
2025-07-16-42 | 07/16/2025 | 07/17/2025 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Precast Concrete Forms
Project DEA | DIME Sample ID | Sample Taken Date | Link |
---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods