Project Details
This page displays current information for project DEA: 07348904.
Project Information
| Project Identifiers | Project ID: 1000161 DEA: 07348904 EFIS: 0718000152 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-39-20.7 |
| Award Date | 05/08/2024 |
| Closeout Date | 08/20/2025 |
| Work Description | REPLACE BRIDGE RAIL WITH CB & BRIDGE DECK POLYESTER CONCRETE OVERLAY. |
| Location Description | LOS ANGELES COUNTY NEAR GLENDORA AT VAN ORNUM CANYON BRIDGE |
| QA Service Level | 1 (Verified on 03/25/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| hai.hong@dot.ca.gov | Hai Hong | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-3 of 3 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-01-30-43 | 01/30/2025 | 01/31/2025 | Acceptance | Aggregate | View |
| 2025-01-30-64 | 01/30/2025 | 01/31/2025 | Acceptance | Aggregate | View |
| 2025-01-22-64 | 01/22/2025 | 01/24/2025 | Quality Control | Polyester | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
