Project Details
This page displays current information for project DEA: 010M7404.
Project Information
Project Identifiers | Project ID: 1000132 DEA: 010M7404 EFIS: 0123000064 MINOR: 01A6370 |
---|---|
DIST-CO-RTE-PM | 01-LAK-29-30.7/30.7 |
Award Date | 11/09/2023 |
Closeout Date | Not set |
Work Description | Lak-29 Wall Treatment |
Location Description | Not set |
QA Service Level | 1 (Verified on 02/29/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Daniel.Kraft@dot.ca.gov | Dan Kraft | Resident Engineer | Caltrans RE DB |
Hunter.Monnot@dot.ca.gov | Hunter Monnot | Structural Representative | Caltrans SR DB |
peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods