Project Details
This page displays current information for project DEA: 060U5004.
Project Information
Project Identifiers | Project ID: 1000113 DEA: 060U5004 EFIS: 0615000300 |
---|---|
DIST-CO-RTE-PM | 06-KER-5-10.2/16.0 |
Award Date | 08/29/2024 |
Closeout Date | Not set |
Work Description | INDIVIDUAL SLAB REPLACEMENT (RSC), HMA (TYPE A) AND RHMA (GAP GRADED). |
Location Description | KERN COUNTY AT AND NEAR WHEELER RIDGE FROM GRAPEVINE UNDERCROSSING TO ROUTE 5/99 SEPARATION |
QA Service Level | 1 (Verified on 02/26/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
bob.decker@dot.ca.gov | Robert Decker | Resident Engineer | Caltrans RE DB |
albert.x.heredia@dot.ca.gov | Albert Heredia | Structural Representative | Caltrans SR DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 103 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2025-04-15-11 | 04/15/2025 | 04/16/2025 | Acceptance | Aggregate | View |
2025-04-14-8 | 04/14/2025 | 04/15/2025 | Acceptance | Aggregate | View |
2025-04-10-15 | 04/10/2025 | 04/11/2025 | Acceptance | Concrete | View |
2025-04-10-14 | 04/10/2025 | 04/11/2025 | Acceptance | Concrete | View |
2025-04-13-3 | 04/13/2025 | 04/14/2025 | Acceptance | Aggregate | View |
2025-04-09-17 | 04/09/2025 | 04/10/2025 | Acceptance | Concrete | View |
2025-04-09-16 | 04/09/2025 | 04/10/2025 | Acceptance | Concrete | View |
2025-04-09-15 | 04/09/2025 | 04/10/2025 | Acceptance | Concrete | View |
2025-04-09-14 | 04/09/2025 | 04/09/2025 | Acceptance | Concrete | View |
2025-04-09-13 | 04/09/2025 | 04/09/2025 | Acceptance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods