Project Details

This page displays current information for project DEA: 051P2804.

Project Information

Project IdentifiersProject ID: 1000078
DEA: 051P2804
EFIS: 0522000016
DIST-CO-RTE-PM05-SCR,-1-17.02/17.02
Award Date04/19/2024
Closeout Date04/01/2025
Work DescriptionREPLACE SEPARATION BRIDGE GIRDER.
Location DescriptionSANTA CRUZ COUNTY IN SANTA CRUZ AT ROUTE 1 NORTHBOUND/17 SEPARATION
QA Service Level1 (Verified on 02/05/2024)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
ian.t.nguyen@dot.ca.govIan NguyenResident EngineerCaltrans RE DB
spozzo@mnsengineers.comStephen PozzoStructural RepresentativeCaltrans SR DB

Samples

Samples submitted for this project.

Displaying 1-7 of 7 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2024-08-22-4108/22/202408/26/2024Quality AssuranceSMTL TM1 - Elastomeric Bearing PadView
2024-09-26-4809/26/202409/26/2024Quality ControlAggregateView
2024-09-27-2509/27/202409/30/2024Quality ControlConcreteView
2024-10-31-110/31/202410/31/2024Quality AssuranceSMTL TM5 - Headed BarsView
2024-10-31-210/31/202410/31/2024Quality ControlSMTL TM5 - Headed BarsView
2024-10-31-5910/31/202410/31/2024Quality AssuranceSMTL TM5 - Headed BarsView
2024-12-17-112/17/202412/17/2024AcceptanceRoadway/Bridge SurfaceView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Precast Concrete Forms

Project DEADIME Sample IDSample Taken DateLink
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods