Project Details
This page displays current information for project DEA: 051Q1804.
Project Information
| Project Identifiers | Project ID: 1000005 DEA: 051Q1804 EFIS: 0522000179 |
|---|---|
| DIST-CO-RTE-PM | 05-SB,SLO-1,101,166,246-Var |
| Award Date | 03/01/2024 |
| Closeout Date | 11/26/2024 |
| Work Description | BRIDGE DECK SEALS, POLYESTER CONCRETE OVERLAYS, & REPLACE JOINT SEALS. |
| Location Description | SANTA BARBARA AND SAN LUIS OBISPO COUNTIES AT VARIOUS LOCATIONS |
| QA Service Level | 1 (Verified on 02/05/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| philip.gaston@dot.ca.gov | Philip Gaston | Resident Engineer | Caltrans RE DB |
| sal.heredia@dot.ca.gov | Sal Heredia | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-2 of 2 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-06-19-13 | 06/19/2024 | 06/19/2024 | Acceptance | Roadway/Bridge Surface | View |
| 2024-05-13-19 | 05/13/2024 | 05/13/2024 | Department Acceptance | Roadway/Bridge Surface | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
