Project Details

This page displays current information for project DEA: No Project.

Project Information

Project Identifiers
DEA: No Project
DIST-CO-RTE-PM---
Award DateNot set
Closeout Date11/01/2022
Work DescriptionSpecial project identifier for material not associated with a project
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Samples

Samples submitted for this project.
Displaying 511-520 of 600 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2019-04-05-2004/05/201904/10/2019VerificationHot Mix AsphaltView
2020-05-06-3305/06/202005/06/2020Quality ControlHot Mix AsphaltView
2017-04-20-3404/20/201704/20/2017Quality ControlHot Mix AsphaltView
2021-02-03-3502/03/202102/03/2021VerificationHot Mix AsphaltView
2022-09-09-1009/09/202209/09/2022Quality ControlHot Mix AsphaltView
2022-09-19-109/19/2022Quality AssuranceHot Mix AsphaltView
2016-02-11-302/11/201602/11/2016VerificationConcreteView
2018-02-13-302/13/201802/13/2018VerificationConcreteView
2018-02-13-402/13/201802/13/2018VerificationConcreteView
2021-08-19-1908/19/202108/25/2021Quality AssuranceConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.
Displaying 1-3 of 3 results.
JMF IDStatusSubmitted ByCreated ByDate CreatedLink
JMF3511-208-2019-122Submittal Authorized For UseClinton EdmistonCT HQ - Sacramento Hot Mix Asphalt Laboratory11/17/2019View
JMF3511-208-2019-121Submittal In Progress CT HQ - Sacramento Hot Mix Asphalt Laboratory11/17/2019View
JMF3511-208-2019-120Submittal Accepted for VerificationClinton EdmistonCT HQ - Sacramento Hot Mix Asphalt Laboratory11/16/2019View

Environmental Product Declaration (EPD)

EPDs submitted for this project.
Declaration NumberProgram OperatorMaterial TypeVendorSubmitted by
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods