Project Details

This page displays current information for project DEA: No Project.

Project Information

Project Identifiers
DEA: No Project
DIST-CO-RTE-PM---
Award DateNot set
Closeout Date11/01/2022
Work DescriptionSpecial project identifier for material not associated with a project
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
No results found.

Samples

Samples submitted for this project.

Displaying 381-390 of 618 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2018-12-17-1212/17/201812/17/2018Quality ControlAggregateView
2018-12-17-1312/17/201812/17/2018Quality ControlAggregateView
2018-12-14-312/14/201812/18/2018VerificationSMTL TM3 - Fastener AssemblyView
2018-12-13-112/13/201812/21/2018StockSMTL TM3 - Fastener AssemblyView
2018-12-13-312/13/201812/17/2018Quality AssuranceSMTL TM2 - Type B Elastomeric Joint SealView
2018-12-13-412/13/201812/17/2018Quality AssuranceSMTL TM2 - Type B Elastomeric Joint SealView
2018-12-13-512/13/201812/17/2018Quality AssuranceSMTL TM2 - Type B Elastomeric Joint SealView
2018-12-10-312/10/201812/12/2018Quality AssuranceSMTL TM7 - Epoxy Coated RebarView
2018-12-10-412/10/201812/12/2018Quality AssuranceSMTL TM7 - Epoxy Coated RebarView
2018-12-07-112/07/201812/13/2018VerificationSMTL TM3 - Fastener AssemblyView

Job Mix Formula (JMF)

JMFs associated with this project.

Displaying 1-3 of 3 results.
JMF IDStatusSubmitted ByCreated ByDate CreatedLink
JMF3511-208-2019-122Submittal Authorized For UseClinton EdmistonCT HQ - Sacramento Hot Mix Asphalt Laboratory11/17/2019View
JMF3511-208-2019-121Submittal In Progress CT HQ - Sacramento Hot Mix Asphalt Laboratory11/17/2019View
JMF3511-208-2019-120Submittal Accepted for VerificationClinton EdmistonCT HQ - Sacramento Hot Mix Asphalt Laboratory11/16/2019View

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods