Project Details
This page displays current information for project DEA: 081G6704.
Project Information
| Project Identifiers | Project ID: 995493 DEA: 081G6704 EFIS: 0816000049 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-79-5.4/11.4 |
| Award Date | 05/23/2024 |
| Closeout Date | Not set |
| Work Description | HOT MIX ASPHALT, SOIL NAIL, STRUCTURAL CONCRETE AND ROADWAY EXC. |
| Location Description | RIVERSIDE COUNTY NEAR TEMECULA FROM 0.4 MILE SOUTH OF SAGE ROAD TO 1.1 MILES SOUTH OF PAUBA ROAD |
| QA Service Level | 1 (Verified on 12/18/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| osama.abdalla@dot.ca.gov | Osama Abdalla | Resident Engineer | Caltrans RE DB |
| arnel.vega@dot.ca.gov | Arnel Vega | Structural Representative | Caltrans SR DB |
| jacob.bailey@dot.ca.gov | Jacob Bailey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 89 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-11-25-44 | 11/25/2025 | 11/25/2025 | Acceptance | Soil | View |
| 2025-11-20-26 | 11/20/2025 | 11/20/2025 | Acceptance | Soil | View |
| 2025-11-13-57 | 11/13/2025 | 11/13/2025 | Acceptance | Soil | View |
| 2025-11-06-108 | 11/06/2025 | 11/06/2025 | Acceptance | Soil | View |
| 2025-10-10-91 | 10/10/2025 | 10/10/2025 | Acceptance | Soil | View |
| 2025-10-08-98 | 10/08/2025 | 10/08/2025 | Acceptance | Soil | View |
| 2025-10-06-106 | 10/06/2025 | 10/06/2025 | Acceptance | Soil | View |
| 2025-10-06-105 | 10/06/2025 | 10/06/2025 | Acceptance | Soil | View |
| 2025-10-03-99 | 10/03/2025 | 10/03/2025 | Acceptance | Soil | View |
| 2025-10-03-98 | 10/03/2025 | 10/03/2025 | Acceptance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
