Project Details
This page displays current information for project DEA: 081G6704.
Project Information
| Project Identifiers | Project ID: 995493 DEA: 081G6704 EFIS: 0816000049 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-79-5.4/11.4 |
| Award Date | 05/23/2024 |
| Closeout Date | Not set |
| Work Description | HOT MIX ASPHALT, SOIL NAIL, STRUCTURAL CONCRETE AND ROADWAY EXC. |
| Location Description | RIVERSIDE COUNTY NEAR TEMECULA FROM 0.4 MILE SOUTH OF SAGE ROAD TO 1.1 MILES SOUTH OF PAUBA ROAD |
| QA Service Level | 1 (Verified on 12/18/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| osama.abdalla@dot.ca.gov | Osama Abdalla | Resident Engineer | Caltrans RE DB |
| arnel.vega@dot.ca.gov | Arnel Vega | Structural Representative | Caltrans SR DB |
| jacob.bailey@dot.ca.gov | Jacob Bailey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 118 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-04-10-19 | 04/10/2026 | 12/24/2025 | Quality Assurance | Concrete | View |
| 2026-04-03-12 | 04/03/2026 | 04/06/2026 | Quality Assurance | Concrete | View |
| 2026-04-01-24 | 04/01/2026 | 04/01/2026 | Acceptance | Soil | View |
| 2026-04-01-23 | 04/01/2026 | 04/01/2026 | Acceptance | Soil | View |
| 2026-03-27-31 | 03/27/2026 | 03/27/2026 | Acceptance | Soil | View |
| 2026-03-25-39 | 03/25/2026 | 03/25/2026 | Acceptance | Soil | View |
| 2026-03-11-66 | 03/11/2026 | 03/11/2026 | Acceptance | Soil | View |
| 2026-03-10-50 | 03/10/2026 | 03/10/2026 | Acceptance | Soil | View |
| 2026-03-06-53 | 03/06/2026 | 03/06/2026 | Acceptance | Soil | View |
| 2026-03-04-74 | 03/04/2026 | 03/04/2026 | Acceptance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
