This page displays current information for project DEA: 081G6704.
Project Information
| Project Identifiers | Project ID: 995493 DEA: 081G6704 EFIS: 0816000049 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-79-5.4/11.4 |
| Award Date | 05/23/2024 |
| Closeout Date | Not set |
| Work Description | HOT MIX ASPHALT, SOIL NAIL, STRUCTURAL CONCRETE AND ROADWAY EXC. |
| Location Description | RIVERSIDE COUNTY NEAR TEMECULA FROM 0.4 MILE SOUTH OF SAGE ROAD TO 1.1 MILES SOUTH OF PAUBA ROAD |
| QA Service Level | 1 (Verified on 12/18/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| osama.abdalla@dot.ca.gov | Osama Abdalla | Resident Engineer | Caltrans RE DB |
| arnel.vega@dot.ca.gov | Arnel Vega | Structural Representative | Caltrans SR DB |
| jacob.bailey@dot.ca.gov | Jacob Bailey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 151 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-06-10-15 | 06/10/2026 | 06/22/2026 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
| 2026-04-20-40 | 04/20/2026 | 04/23/2026 | Production Start-Up | Hot Mix Asphalt | View |
| 2026-05-12-26 | 05/12/2026 | 05/12/2026 | Acceptance | Soil | View |
| 2026-04-28-45 | 04/28/2026 | 05/01/2026 | Acceptance | Hot Mix Asphalt | View |
| 2026-04-27-53 | 04/27/2026 | 05/01/2026 | Acceptance | Hot Mix Asphalt | View |
| 2026-04-24-62 | 04/24/2026 | 05/01/2026 | Acceptance | Hot Mix Asphalt | View |
| 2026-04-23-57 | 04/23/2026 | 05/01/2026 | Acceptance | Hot Mix Asphalt | View |
| 2026-04-22-65 | 04/22/2026 | 05/01/2026 | Acceptance | Hot Mix Asphalt | View |
| 2026-04-21-59 | 04/21/2026 | 05/01/2026 | Acceptance | Hot Mix Asphalt | View |
| 2026-04-20-38 | 04/20/2026 | 05/01/2026 | Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||