Project Details

This page displays current information for project DEA: 080R8014.

Project Information

Project IdentifiersProject ID: 995451
DEA: 080R8014
EFIS: 0820000075
DIST-CO-RTE-PM08-SBD-15-0/12
Award Date06/03/2024
Closeout DateNot set
Work DescriptionConstruction of one to two HOT lanes in each direction on Interstate 15 between SBD/RIV County Line to Foothill Blvd
Location DescriptionInterstate 15 between SBD/RIV County Line to Foothill Blvd
QA Service Level2 (Verified on 05/16/2023)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
vicente.bunyi@dot.ca.govVicente BunyiResident EngineerCaltrans RE DB
jbpatel@trccompanies.comJagdish PatelOversight Resident EngineerCaltrans REO DB
Irma.Ulloa@dot.ca.govIrma UlloaStructural RepresentativeCaltrans SR DB
ahusain@wsp.comAbunnasr HusainOversight Structural RepresentativeCaltrans SRO DB
jennifer.olarte@dot.ca.govJennifer OlarteMETS REPCaltrans METS REP DB
prakash.gowda@dot.ca.govPrakash GowdaDistrict Materials Engineer - Field Lab FontanaCaltrans District Materials Engineer
zihui.li@dot.ca.govZihui LiDistrict Materials Engineer - SRL PCC/Agg/Soils LabCaltrans District Materials Engineer
cristina.paredes@dot.ca.govCristina ParedesDistrict Materials Engineer - SRL HMA and Binder LabsCaltrans District Materials Engineer
sittampalam.sathiskumar@dot.ca.govSittampalam SathiskumarDistrict Materials Engineer - DesignCaltrans District Materials Engineer
kaushalkumar.talati@dot.ca.govKaushalkumar TalatiDistrict Materials Engineer - Field Lab Barstow and HesperiaCaltrans District Materials Engineer

Samples

Samples submitted for this project.

Displaying 1-5 of 5 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2026-09-22-6709/22/202609/22/2026AcceptanceAggregateView
2026-01-13-5101/13/2026Quality ControlPrecast ConcreteView
2025-08-22-10308/22/2025Quality ControlPrecast ConcreteView
2026-09-22-2609/22/202605/22/2026Quality AssuranceConcreteView
2026-06-22-3006/22/202606/25/2026Quality AssuranceSMTL TM4 - Prestressing StrandView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Precast Concrete Forms

Project DEADIME Sample IDSample Taken DateLink
080R80142026-01-13-5101/13/2026View
080R80142025-08-22-10308/22/2025View

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods