Project Details
This page displays current information for project DEA: 07349504.
Project Information
| Project Identifiers | Project ID: 995449 DEA: 07349504 EFIS: 0718000161 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-2,5,101,170-Var |
| Award Date | 02/29/2024 |
| Closeout Date | Not set |
| Work Description | INSTALL NEW TRANSPORTATION MANAGEMENT SYSTEM ELEMENTS. |
| Location Description | LOS ANGELES COUNTY IN LOS ANGELES FROM ROUTE 134/170 SEPARATION TO ROUTE 170/5 SEPARATION |
| QA Service Level | 1 (Verified on 01/22/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| kevin.bui@dot.ca.gov | Kevin Bui | Resident Engineer | Caltrans RE DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 35 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-04-21-7 | 04/21/2025 | 04/21/2025 | Acceptance | Soil | View |
| 2025-03-20-37 | 03/20/2025 | 03/24/2025 | Verification | Asphalt Binder | View |
| 2025-03-20-26 | 03/20/2025 | 03/24/2025 | Verification | Aggregate | View |
| 2025-03-21-14 | 03/21/2025 | 03/24/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-03-20-11 | 03/20/2025 | 03/24/2025 | Production Start-Up | Hot Mix Asphalt | View |
| 2025-01-29-7 | 01/29/2025 | 01/29/2025 | Quality Assurance | Aggregate | View |
| 2025-01-24-17 | 01/24/2025 | 01/24/2025 | Quality Assurance | Aggregate | View |
| 2025-01-24-16 | 01/24/2025 | 01/24/2025 | Quality Assurance | Aggregate | View |
| 2025-01-24-15 | 01/24/2025 | 01/24/2025 | Quality Assurance | Aggregate | View |
| 2025-01-24-14 | 01/24/2025 | 01/24/2025 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
