Project Details
This page displays current information for project DEA: 060X2604.
Project Information
| Project Identifiers | Project ID: 995447 DEA: 060X2604 EFIS: 0618000045 |
|---|---|
| DIST-CO-RTE-PM | 06-TUL-198-1.6/43.9 |
| Award Date | 03/13/2024 |
| Closeout Date | Not set |
| Work Description | REMOVE, INSTALL, AND REPAIR DRAINAGE FACILITIES. |
| Location Description | TULARE COUNTY IN AND NEAR VISALIA AT VARIOUS LOCATIONS FROM 1.6 MILES EAST OF KINGS COUNTY LINE TO 0.2 MILE WEST OF SEQUOIA NATIONAL PARK BOUNDARY |
| QA Service Level | 1 (Verified on 11/16/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| chris.wilfong@dot.ca.gov | Chris Wilfong | Resident Engineer | Caltrans RE DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 79 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-06-19-19 | 06/19/2025 | 06/19/2025 | Quality Assurance | Soil | View |
| 2025-06-19-18 | 06/19/2025 | 06/19/2025 | Quality Assurance | Soil | View |
| 2025-06-19-17 | 06/19/2025 | 06/19/2025 | Quality Assurance | Soil | View |
| 2025-06-19-16 | 06/19/2025 | 06/19/2025 | Quality Assurance | Soil | View |
| 2025-06-13-38 | 06/13/2025 | 06/13/2025 | Quality Assurance | Soil | View |
| 2025-06-13-37 | 06/13/2025 | 06/13/2025 | Quality Assurance | Soil | View |
| 2025-06-12-13 | 06/12/2025 | 06/12/2025 | Quality Assurance | Soil | View |
| 2025-06-12-12 | 06/12/2025 | 06/12/2025 | Quality Assurance | Soil | View |
| 2025-06-11-37 | 06/11/2025 | 06/11/2025 | Quality Assurance | Soil | View |
| 2025-06-11-36 | 06/11/2025 | 06/11/2025 | Quality Assurance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
