Project Details

This page displays current information for project DEA: 043Y1304.

Project Information

Project IdentifiersProject ID: 995358
DEA: 043Y1304
EFIS: 0423000200
DIST-CO-RTE-PM04-ALA-580-43.15/43.15
Award Date01/16/2023
Closeout DateNot set
Work DescriptionPerform the application of Polyurethane Foam injection in lane #3, #4 and outside shoulder, clean drainage system and investigate for damage/blockage, install Slope Inclinometer to monitor slope movement, install RSP at the outfall
Location DescriptionNot set
QA Service Level1 (Verified on 01/08/2024)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
dylan.larose@dot.ca.govDylan LaroseMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Precast Concrete Forms

Project DEADIME Sample IDSample Taken DateLink
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods